Acceptable Use Policy
The rules governing the rack: what it's for, how it's paid for, fair use, and where liability sits.
Version 2023-12-23
Use
The purpose of the Community Rack is to provide colocation / housing for the members of the association. Under no circumstances is the Community Rack’s offering intended to compete with commercial colocation / housing providers.
Funding
The community idea comes first. Costs are shared fairly between all participants. The more people use the rack, the cheaper it becomes for everyone. The price is adjusted monthly, or as needed, by the board.
We distinguish between the following costs:
- One-off costs for acquisitions and investment (entry fee)
- Recurring usage costs for space
- Recurring usage costs for power
Until further notice the bandwidth consumed is included in the usage costs as a flat rate; see also the “Fair use” section.
Entry fee
To cover the one-off acquisition costs for infrastructure, a rack entry fee of
CHF 100
is charged. This cost applies per device, not per member.
Recurring usage costs
The following basis of calculation applies as of 1 January 2024.
Every height unit has a power allowance included directly, per device:
- 1 height unit — 100 W power allowance
- Zero U — 20 W power allowance
Fair use: a graduated fair use policy applies, which allows members to exceed the power allowance without an immediate cost consequence. After one year the fair use factor is reduced, and finally abolished completely in 2026.
Fair use factors:
- 2024: factor 2
- 1 height unit = max 200 W
- Zero U = 40 W
- 2025: factor 1.5
- 1 height unit = max 150 W
- Zero U = 30 W
- 2026: fade-out of the fair use factors = factor 1
- 1 height unit = max 100 W
- Zero U = 20 W
Commercial use
The devices in the rack should mainly be used privately. If money is earned with the device, or it is used commercially, the board must be informed and will decide on its legitimacy. The aim: we do not want to compete with commercial colocation / housing providers.
SLA / availability
No SLA is guaranteed. Availability is best effort.
Base infrastructure and its operation (operations group)
Base infrastructure covers everything necessary to operate a colocation rack:
- Routing including BGP
- LIR (internet address resources)
- Switching
- Power and capacity provision
- Community servers (wiki, website, monitoring)
An operations group is responsible for operations. It organises itself independently and reports once a year to the members’ meeting. Acquisitions may be made within the budget approved by the members’ meeting. Larger acquisitions and changes to the infrastructure require a motion to the members’ meeting.
Tasks of the operations group:
- Maintenance of the base infrastructure
- Ensuring access to the rack
- Availability of network and power (monitoring)
- Assistance with problems
- Further development of the technical base
- Management of the available resources:
- IP addressing
- Power / capacity
- Space in the rack
- Technical handling of arrivals and departures in the rack
- Processing and forwarding abuse or DMCA cases in consultation with the board
Access to the rack
Since every access (key / registration of a fingerprint) incurs a cost, access is limited to a minimal number of people. These people agree to be available to all rack participants for access to the rack.
Ownership of equipment
All base infrastructure material belongs to the association or is rented by the association. If a device is rented, a written contract with precise terms must be in place.
Fair use
Participants in the rack are expected to behave fairly towards the other participants and towards the association. This includes:
- No excessive use of the available bandwidth (max 100 Mbps — 95th percentile)
- No excessive load on the power supply
- No illegal activity
If a participant does not adhere to these rules, the resulting costs are charged to that participant. In severe cases a participant can be excluded from using the rack (see Exclusion).
Exclusion
If a member comes to attention through breaches of the acceptable use policy, or disrupts the smooth operation of the Community Rack, the operations group can report this to the board. The board will then deliberate on exclusion from the Community Rack.
Liability
The association gives no warranty for the availability of power and network connectivity. Every user is responsible for their own devices. All liability is excluded.